Mixed Numbers Color by Number — Farm Animal Turkey
Color by Number · 4.NF.B.3+1
Math worksheets · Grades 1–6
Solve each problem, color the matching number, and a hidden picture appears as students work. Self-checking practice that feels like play — printable and digital, auto-graded, themed for every season.
Two ways to color
Printable & interactive worksheets
Hundreds of ready-made pages by skill, grade and theme. Print them, or assign them digitally and let them grade themselves.
Play online
Hundreds of math skills, K to 8. Fresh problems every time you play.
Hand-picked favorites across skills and grades.
Find the right page fast
Pick a math skill, a grade, or a theme your class is into.
No student logins and nothing to print — every resource here is assignable.
On any worksheet, game, or reading passage.
Students join at workybooks.com/join — no accounts, no passwords.
Scores come back to you automatically as students finish.
Tie the math skill to what your class is excited about.
Color by number worksheets for this grade band.
Color by number worksheets for this grade band.
Color by number worksheets for this grade band.
Color-by-number worksheets turn math practice into something students actually look forward to. Each problem's answer maps to a color, so as children solve addition, subtraction, multiplication or fraction problems, a hidden picture comes to life. It's practice that feels like play — and it self-checks, because a wrong answer means a wrong color.
Our color-by-number collection spans grades 1 through 6 and every core math skill: addition and subtraction within 20 and beyond, multiplication and division facts, mixed operations, number sense, place value and rounding, fractions, decimals, geometry, measurement, and time and money. Browse by the skill you're teaching, by your grade, or by a theme your class loves.
Every page is available as a print-ready PDF and as an interactive digital activity. Print them for centers, early finishers, and homework, or assign the digital version for instant, auto-checked practice — same picture, your choice. Because the activity reveals an image, students get immediate, motivating feedback without you grading a thing.
Themed pictures — animals, unicorns, dinosaurs, space, and seasonal favorites like Christmas and Halloween — make it easy to tie skill practice to what's exciting in your classroom right now. Whether you need quiet, focused review or a holiday treat that still builds fluency, color-by-number worksheets keep students engaged while they practice the math that matters.
How color by number works
Three steps turn a page of math problems into a picture — and grade themselves along the way.
Solve the problem
Each region of the picture holds a math problem — addition, multiplication, a fraction. Students work it out.
Match answer to color
The answer maps to a number, the number maps to a color. A wrong answer means a wrong color — it self-checks.
Reveal the picture
As every region gets its color, a hidden image appears. Instant, motivating feedback — no grading required.
Wrong answer, wrong color — students catch their own mistakes, so you never grade a page.
A color-by-number is a math worksheet where each answer maps to a color. Students solve a problem, find the matching number on the picture, and color it in — so a hidden image appears as they work. It turns practice into a self-checking, low-pressure activity.
Addition, subtraction, multiplication, division and mixed operations, plus number sense, place value & rounding, fractions, decimals, geometry, measurement, and time & money — spanning grades 1–6.
Both. Every color-by-number works as a print-ready PDF for crayons and markers, and as an interactive digital activity students can complete and that auto-checks online.
They work from grade 1 through grade 6 — early grades focus on addition, subtraction and number recognition, while upper grades use multiplication, fractions and decimals to color more detailed pictures.
Yes — animals, unicorns, space, dinosaurs, and seasonal themes like Christmas and Halloween, so you can match the math skill to what your students are excited about.
Simple pricing
No contracts. Cancel anytime. Or just buy what you need, à la carte.
Black Friday sale · ends Dec 1
Everything included. Renews at $49.99/year.
No subscription. Yours to keep.
Volume licenses with admin dashboards, rostering, and dedicated support. Get a custom quote for your team.